Triple
T36992897
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | گریگورین کیلنڈر |
E915152
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | عیسوی کیلنڈر |
C1987
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: عیسوی کیلنڈر Context triple: [گریگورین کیلنڈر, instanceOf, عیسوی کیلنڈر]
-
A.
lunisolar calendar
A lunisolar calendar is a dating system that combines lunar months with periodic adjustments to align with the solar year, ensuring that months track the moon’s phases while years remain synchronized with the seasons.
-
B.
Islamic calendar
The Islamic calendar is a purely lunar calendar consisting of 12 months of 29 or 30 days each, used primarily to determine the dates of Islamic religious observances and holidays.
-
C.
Badí‘ calendar month
A Badí‘ calendar month is one of the nineteen equal periods of nineteen days each that structure the Bahá’í year, each bearing a distinct spiritual name and significance.
-
D.
solar calendar
chosen
A solar calendar is a timekeeping system in which dates are based on the Earth's position in its orbit around the Sun, typically approximating the length of the tropical year.
-
E.
Mesoamerican calendar
A Mesoamerican calendar is a complex, cyclical timekeeping system used by pre-Columbian cultures in Mesoamerica to track ritual, agricultural, and astronomical events.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e8f1a8c81909db172ed31304971 |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:14 p.m.