Triple

T36987115
Position Surface form Disambiguated ID Type / Status
Subject SA-204 E914994 entity
Predicate instanceOf P0 FINISHED
Object Saturn IB launch vehicle C65048 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Saturn IB launch vehicle
Context triple: [SA-204, instanceOf, Saturn IB launch vehicle]
  • A. Saturn I rocket
    The Saturn I rocket was an early American expendable launch vehicle developed by NASA in the late 1950s and 1960s to test Apollo program hardware and launch heavy payloads into low Earth orbit.
  • B. Saturn V mobile launcher
    The Saturn V mobile launcher was a massive, self-contained launch platform and service structure that transported, supported, and provided umbilical connections to the Saturn V rocket from assembly to liftoff.
  • C. Saturn I mission
    The Saturn I mission class represents early NASA launch operations using the Saturn I rocket to test and validate heavy-lift launch vehicle technologies and support the development of later Apollo-era missions.
  • D. Apollo spacecraft variant
    An Apollo spacecraft variant is a specific configuration or modification of the Apollo command and service modules, and sometimes the lunar module, tailored to different mission profiles, technological updates, or experimental objectives within the Apollo program.
  • E. Apollo Lunar Module
    The Apollo Lunar Module was a two-stage, crewed spacecraft designed exclusively for lunar orbit operations and surface landings during NASA's Apollo missions.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e8dd0408190b8b46da118ea5128 completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:14 p.m.