Triple

T36979789
Position Surface form Disambiguated ID Type / Status
Subject East Mission Bay Drive E914794 entity
Predicate instanceOf P0 FINISHED
Object transportation infrastructure C82 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e8d13b4819089af24a47ce092fc completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:14 p.m.