Triple
T36977777
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Current Employment Statistics survey |
E914745
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | economic statistics program |
C2749
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: economic statistics program Context triple: [Current Employment Statistics survey, instanceOf, economic statistics program]
-
A.
system of macroeconomic statistics
A system of macroeconomic statistics is an integrated framework of concepts, classifications, and standardized measures used to collect, organize, and present data on the overall performance, structure, and dynamics of an economy.
-
B.
economic metric
An economic metric is a quantitative measure used to assess, compare, and track the performance, health, or trends of an economy, market, or financial activity.
-
C.
U.S. economic time series
A U.S. economic time series is a chronologically ordered sequence of quantitative observations that track the evolution of a specific economic indicator (such as GDP, inflation, or unemployment) in the United States over time.
-
D.
government statistical program
chosen
A government statistical program is an organized, ongoing initiative by a public agency to systematically collect, process, analyze, and disseminate data on specific aspects of the population, economy, or environment to inform policy and public understanding.
-
E.
economic report
An economic report is a structured document that analyzes and presents data, trends, and forecasts about economic conditions to inform decision-making by policymakers, businesses, and investors.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e8d13b4819089af24a47ce092fc |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:14 p.m.