Triple

T36977603
Position Surface form Disambiguated ID Type / Status
Subject Other Dependent Credit E914741 entity
Predicate computedOnSchedule P160537 FINISHED
Object Schedule 8812 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Schedule 8812 | Statement: [Other Dependent Credit, computedOnSchedule, Schedule 8812]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: computedOnSchedule
Context triple: [Other Dependent Credit, computedOnSchedule, Schedule 8812]
  • A. isOnScheduleOf chosen
    Indicates that something is included in and follows the planned timing or sequence defined by a particular schedule.
  • B. isScheduled
    Indicates that an event, task, or action has been planned and assigned a specific time or time range to occur.
  • C. scheduledDuring
    Indicates that one event or activity is planned to occur within the time interval defined by another event or period.
  • D. scheduledAs
    Indicates that one entity is assigned or arranged to occur or function in the role, time, or capacity specified by another entity within a schedule.
  • E. hasPerformanceSchedule
    Indicates that an entity has an associated timetable or plan specifying when its performances or shows are scheduled to occur.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e8d13b4819089af24a47ce092fc completed May 3, 2026, 3:49 p.m.
NER Named-entity recognition batch_69fb154c0fe08190a2e41e7a29b6055f completed May 6, 2026, 10:17 a.m.
PD Predicate disambiguation batch_69f9fecc005c8190be082a8689193745 completed May 5, 2026, 2:29 p.m.
Created at: May 3, 2026, 4:14 p.m.