Triple

T36977444
Position Surface form Disambiguated ID Type / Status
Subject Liberal Food Plan E914738 entity
Predicate instanceOf P0 FINISHED
Object diet cost standard C62902 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: diet cost standard
Context triple: [Liberal Food Plan, instanceOf, diet cost standard]
  • A. nutrition planning tool
    A nutrition planning tool is a system that helps users design, organize, and track personalized meal plans and nutrient intake based on their dietary needs, preferences, and health goals.
  • B. commercial diet program
    A commercial diet program is a structured, for-profit weight management plan that provides prescribed eating guidelines, products, and/or support services to help individuals lose or control weight.
  • C. multi-course meal
    A multi-course meal is a structured dining experience consisting of a sequence of distinct dishes served in a specific order, often progressing from lighter to heavier courses.
  • D. nutrition information center
    A nutrition information center is a dedicated facility or service that provides reliable, evidence-based guidance, resources, and counseling on food, diet, and healthy eating to individuals and communities.
  • E. food menu item
    A food menu item is a distinct offering listed on a menu that specifies a particular dish or beverage, typically including its name, description, and price.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e8d13b4819089af24a47ce092fc completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:14 p.m.