Triple
T36905564
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 310th Civil Engineer Flight |
E912765
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | civil engineer unit |
C35523
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: civil engineer unit Context triple: [310th Civil Engineer Flight, instanceOf, civil engineer unit]
-
A.
civil engineer
A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
-
B.
civil engineering designation
A civil engineering designation is a formal title or credential that identifies a professional’s qualification, specialization, and authority to practice within the civil engineering field.
-
C.
corps of engineers
A corps of engineers is an organized body of military or civilian engineers responsible for planning, designing, constructing, and maintaining infrastructure and technical projects, often in support of national defense or public works.
-
D.
civil engineer squadron
chosen
A civil engineer squadron is a military unit responsible for planning, constructing, maintaining, and repairing infrastructure and facilities to support operational readiness and base sustainability.
-
E.
civil engineering support organization
A civil engineering support organization is an entity that provides specialized technical, logistical, administrative, and project management services to assist civil engineers and infrastructure projects throughout their lifecycle.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e879768819085c2fb31a6a5b44b |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:13 p.m.