Triple

T36896931
Position Surface form Disambiguated ID Type / Status
Subject RAE Bedford E911915 entity
Predicate instanceOf P0 FINISHED
Object wind tunnel facility C3875 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: wind tunnel facility
Context triple: [RAE Bedford, instanceOf, wind tunnel facility]
  • A. wind tunnel chosen
    A wind tunnel is a controlled testing facility where air is driven past stationary objects to study aerodynamic properties such as lift, drag, and flow behavior.
  • B. flight simulation facility
    A flight simulation facility is a specialized environment equipped with advanced simulators and support systems that replicate real-world aircraft operations for pilot training, research, and systems testing.
  • C. flight test center
    A flight test center is a specialized facility where aircraft, spacecraft, or related systems are systematically tested, evaluated, and validated under controlled conditions to ensure performance, safety, and regulatory compliance.
  • D. aerodynamic technology
    Aerodynamic technology encompasses the principles, tools, and systems used to control and optimize the behavior of air and other gases around objects to reduce drag, increase efficiency, and improve performance in applications such as aviation, automotive design, and wind engineering.
  • E. testing facility
    A testing facility is a specialized environment equipped with tools, equipment, and procedures designed to systematically evaluate, measure, and validate the performance, safety, or quality of products, systems, or processes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e841b54819097e7fa768bbc70b2 completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:13 p.m.