Triple

T3689522
Position Surface form Disambiguated ID Type / Status
Subject County Cork E78308 entity
Predicate roadNetwork P385 FINISHED
Object N25 road E389217 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: N25 road | Statement: [County Cork, roadNetwork, N25 road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: N25 road
Context triple: [County Cork, roadNetwork, N25 road]
  • A. N25 road chosen
    The N25 road is a major national primary route in Ireland that runs along the south coast, linking Cork with Waterford and other key towns.
  • B. N52 road
    The N52 road is a major French national route serving the Longwy area in northeastern France and connecting it to the wider regional road network.
  • C. N125 road
    The N125 road is a major regional route in Portugal’s Algarve region that runs parallel to the A22 motorway, connecting numerous coastal towns and cities.
  • D. N22 road
    The N22 road is a major national primary route in Ireland that links Cork city with Killarney and Tralee in County Kerry.
  • E. N20 road
    The N20 road is a major national primary route in Ireland that connects the cities of Cork and Limerick, passing through several towns in County Cork and County Limerick.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85e285a081908f8cbfa9e2ed9b75 completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adc4cb47208190b1321af859d02c51 completed March 8, 2026, 6:49 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5120d23f481908f71e291c089505c completed March 14, 2026, 7:45 a.m.
Created at: March 8, 2026, 3:26 p.m.