Triple

T36871235
Position Surface form Disambiguated ID Type / Status
Subject Kirby calculus E911226 entity
Predicate helpsCompute P82730 FINISHED
Object intersection form of a 4-manifold from a link diagram LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: intersection form of a 4-manifold from a link diagram | Statement: [Kirby calculus, helpsCompute, intersection form of a 4-manifold from a link diagram]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: helpsCompute
Context triple: [Kirby calculus, helpsCompute, intersection form of a 4-manifold from a link diagram]
  • A. computationInput chosen
    Indicates that an entity serves as input data or parameters consumed by a computation or processing activity.
  • B. computes
    Indicates that one entity performs a calculation or processing operation to produce a result from given data or inputs.
  • C. targetComputation
    Indicates a relationship where one computation is designated or identified as the specific goal, focus, or intended result among possible computations.
  • D. usesComputationMethod
    Indicates that an entity performs its processing or decision-making by applying a specified computational method or algorithm.
  • E. computationalCost
    Indicates the amount of computing resources (such as time, memory, or processing power) required to perform a given operation or process.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e82339881909607a65c0503d941 completed May 3, 2026, 3:49 p.m.
NER Named-entity recognition batch_69f9fd6834cc8190aa27153d6a99f3bb completed May 5, 2026, 2:23 p.m.
PD Predicate disambiguation batch_69f7cf7890008190a8bc355ff2d61c86 completed May 3, 2026, 10:43 p.m.
Created at: May 3, 2026, 4:13 p.m.