Triple

T36859327
Position Surface form Disambiguated ID Type / Status
Subject Leighton Buzzard railway station E910887 entity
Predicate electrifiedOnRoute P94567 FINISHED
Object West Coast Main Line electrification LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: West Coast Main Line electrification | Statement: [Leighton Buzzard railway station, electrifiedOnRoute, West Coast Main Line electrification]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrifiedOnRoute
Context triple: [Leighton Buzzard railway station, electrifiedOnRoute, West Coast Main Line electrification]
  • A. electrifiedRoute
    Indicates that a transportation route is equipped with electrical infrastructure enabling electric-powered vehicles or trains to operate along it.
  • B. electrifiedAlongMostOfRoute
    Indicates that the route is equipped with electric power infrastructure along the majority of its length, but not necessarily its entirety.
  • C. isElectrifiedSectionOf
    Indicates that one section or segment is a part of a larger entity and has been equipped with electrical power or electrification.
  • D. electrificationTerminusOf
    Indicates that a location or point serves as the end of an electrified section of a route, line, or network.
  • E. railElectrificationIncludes chosen
    Indicates that a rail electrification system or project encompasses, covers, or incorporates a specified segment, component, or area of railway infrastructure.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e8033d48190a59274f86f13be48 completed May 3, 2026, 3:49 p.m.
NER Named-entity recognition batch_69ff80d9a1d88190a95b1488acd6e2e5 completed May 9, 2026, 6:45 p.m.
PD Predicate disambiguation batch_69ff802ae2dc819093a3cda42b63dcbd completed May 9, 2026, 6:42 p.m.
Created at: May 3, 2026, 4:13 p.m.