Triple

T36848838
Position Surface form Disambiguated ID Type / Status
Subject Dasu Hydropower Project area E910622 entity
Predicate instanceOf P0 FINISHED
Object infrastructure project site C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure project site
Context triple: [Dasu Hydropower Project area, instanceOf, infrastructure project site]
  • A. construction site
    A construction site is a designated area where buildings, infrastructure, or other structures are actively being built, renovated, or demolished using labor, machinery, and materials.
  • B. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • C. demolished building site
    A demolished building site is an area where a structure has been recently torn down, typically characterized by rubble, exposed foundations, construction equipment, and preparations for clearance or redevelopment.
  • D. industrial site
    An industrial site is a designated area of land developed and equipped with infrastructure and facilities for manufacturing, processing, storage, or other large-scale industrial operations.
  • E. haul-out site
    A haul-out site is a location on land or ice where marine animals, such as seals or sea lions, temporarily leave the water to rest, breed, molt, or socialize.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e8033d48190a59274f86f13be48 completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:13 p.m.