Triple

T3682898
Position Surface form Disambiguated ID Type / Status
Subject G-Mex tram stop E78150 entity
Predicate systemOpeningPhase P22825 FINISHED
Object Phase 1 of Manchester Metrolink LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Phase 1 of Manchester Metrolink | Statement: [G-Mex tram stop, systemOpeningPhase, Phase 1 of Manchester Metrolink]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: systemOpeningPhase
Context triple: [G-Mex tram stop, systemOpeningPhase, Phase 1 of Manchester Metrolink]
  • A. initialOpening
    Indicates the first or earliest instance in which something is opened, begun, or made accessible.
  • B. programPhase chosen
    Indicates the specific stage or phase within a broader program or process that an entity is currently associated with.
  • C. mainPhase
    Indicates that an event, action, or state occurs during the primary or central phase of a larger process or sequence.
  • D. system
    Indicates that an entity functions as or belongs to a structured, organized set of components or processes that operate together as a system.
  • E. bootProcess
    Indicates the sequence of actions required to start up and initialize a system from a powered-off or reset state.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85e18c1c8190be8aafb227f39f48 completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adc4948cc48190ab1f59cc4a2437cc completed March 8, 2026, 6:48 p.m.
PD Predicate disambiguation batch_69adb84be1fc81909721c871babb4633 completed March 8, 2026, 5:56 p.m.
Created at: March 8, 2026, 3:25 p.m.