Triple
T36813788
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tha Tien Pier |
E909668
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | boat terminal |
C6402
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: boat terminal Context triple: [Tha Tien Pier, instanceOf, boat terminal]
-
A.
boat harbour
A boat harbour is a sheltered body of water equipped with facilities for mooring, servicing, and protecting boats and small ships.
-
B.
boatyard
A boatyard is a waterside facility where boats and ships are built, repaired, maintained, and often stored on land.
-
C.
ferry terminal
chosen
A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
-
D.
wharves
Wharves are structures built along a shoreline or projecting into a body of water where ships can dock to load and unload cargo or passengers.
-
E.
docking facility
A docking facility is a designated structure or area where vehicles, vessels, or spacecraft securely attach for loading, unloading, maintenance, or passenger transfer.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e7cbbf48190891227b14d041139 |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:13 p.m.