Triple

T36807278
Position Surface form Disambiguated ID Type / Status
Subject Mediterranean rationalism E909489 entity
Predicate instanceOf P0 FINISHED
Object cultural current C64884 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cultural current
Context triple: [Mediterranean rationalism, instanceOf, cultural current]
  • A. cultural review
    A cultural review is a critical evaluation and interpretation of artistic, social, or cultural works or events, examining their meaning, context, and impact on society.
  • B. culture
    Culture is the shared system of values, beliefs, practices, symbols, and artifacts that shapes how a group of people understand and interact with the world and with each other.
  • C. cultural horizon
    A cultural horizon is a distinct layer or phase in the archaeological or historical record characterized by a widespread, relatively uniform set of cultural traits, artifacts, or practices shared across a broad region and time period.
  • D. cultural chronicle
    A cultural chronicle is a curated, time-ordered record that documents and interprets the evolving beliefs, practices, artifacts, and social dynamics of a particular culture or group.
  • E. cultural nation
    A cultural nation is a community of people unified primarily by shared culture, language, traditions, and historical experience rather than by political borders or legal citizenship.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e7cbbf48190891227b14d041139 completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:13 p.m.