Triple

T36771587
Position Surface form Disambiguated ID Type / Status
Subject Historic Columbia River Highway bridge over Sandy River E908490 entity
Predicate instanceOf P0 FINISHED
Object reinforced-concrete arch bridge C9757 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: reinforced-concrete arch bridge
Context triple: [Historic Columbia River Highway bridge over Sandy River, instanceOf, reinforced-concrete arch bridge]
  • A. reinforced-concrete bridge
    A reinforced-concrete bridge is a structural system in which concrete and embedded steel reinforcement work together to safely carry and distribute loads across a span.
  • B. reinforced-concrete bridge chosen
    A reinforced-concrete bridge is a structural system in which concrete and embedded steel reinforcement work together to safely span obstacles and carry traffic loads over a defined distance.
  • C. steel arch bridge
    A steel arch bridge is a structure that uses a curved steel arch as its main load-bearing element to span a distance and support traffic above.
  • D. concrete bridge
    A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable pathway for vehicles, pedestrians, or rail traffic.
  • E. concrete bridge
    A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable and stable pathway for transportation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e786ba481909cdcf6cf6b39dd32 completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:12 p.m.