Triple
T36761200
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | PSLV-C1 |
E908204
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | PSLV launch |
C3404
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: PSLV launch Context triple: [PSLV-C1, instanceOf, PSLV launch]
-
A.
expendable launch system
An expendable launch system is a type of launch vehicle designed for a single use, where major components are not recovered after delivering payloads such as satellites or spacecraft into orbit or on a trajectory.
-
B.
sounding rocket
A sounding rocket is a suborbital rocket designed to carry scientific instruments into the upper atmosphere or near-space for brief periods to conduct research and measurements.
-
C.
small-lift launch vehicle
chosen
A small-lift launch vehicle is a relatively low-mass rocket system designed to place small payloads, typically under a few thousand kilograms, into Earth orbit or suborbital trajectories.
-
D.
proposed launch vehicle
A proposed launch vehicle is a conceptual or preliminary design for a rocket system intended to transport payloads from Earth’s surface into space, but not yet built or operational.
-
E.
space launch vehicle development program
A space launch vehicle development program is an organized, multi-phase effort to design, test, and qualify rockets and associated systems for reliably delivering payloads from Earth to space.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e779bec8190be0e1f87a131e0f4 |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:12 p.m.