Triple

T36761071
Position Surface form Disambiguated ID Type / Status
Subject CIMIC Group E908201 entity
Predicate instanceOf P0 FINISHED
Object infrastructure contractor C64651 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure contractor
Context triple: [CIMIC Group, instanceOf, infrastructure contractor]
  • A. infrastructure construction company chosen
    An infrastructure construction company is an organization that plans, designs, and builds large-scale public and private works such as roads, bridges, tunnels, utilities, and related civil engineering projects.
  • B. industrial contractor
    An industrial contractor is a specialized company or individual responsible for planning, managing, and executing construction, installation, maintenance, or upgrade projects within industrial facilities such as factories, plants, and warehouses.
  • C. pipeline construction company
    A pipeline construction company is an organization that specializes in planning, designing, and building pipeline systems for transporting liquids or gases, often including related infrastructure and maintenance services.
  • D. construction pioneer
    A construction pioneer is an innovative leader who introduces groundbreaking methods, materials, or technologies that significantly advance how the built environment is designed and constructed.
  • E. MEP contractor
    An MEP contractor is a specialized construction professional or firm responsible for the design, coordination, installation, and maintenance of mechanical, electrical, and plumbing systems in buildings and infrastructure projects.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e779bec8190be0e1f87a131e0f4 completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:12 p.m.