Triple

T3670374
Position Surface form Disambiguated ID Type / Status
Subject Victoria Embankment (part) E77862 entity
Predicate instanceOf P0 FINISHED
Object embankment section C12933 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: embankment section
Context triple: [Victoria Embankment (part), instanceOf, embankment section]
  • A. embankment dam
    An embankment dam is a large artificial barrier constructed from compacted earth or rock materials to hold back water and create a reservoir.
  • B. seawall
    A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
  • C. river bank
    A river bank is the sloping land alongside a river that confines its water flow and shapes its course.
  • D. waterfall section
    A waterfall section is a vertical or longitudinal drawing that illustrates a sequence of stepped or cascading level changes, often used to show how spaces, terrains, or elements transition in height over a distance.
  • E. embayment
    An embayment is a recessed coastal indentation, such as a bay or inlet, where the shoreline curves inward and is partially enclosed by land.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85e083008190b2e1b7085fe500bd completed March 8, 2026, 2:21 p.m.
Created at: March 8, 2026, 3:25 p.m.