Triple

T36702233
Position Surface form Disambiguated ID Type / Status
Subject Oregon Trail region E906260 entity
Predicate instanceOf P0 FINISHED
Object travel route corridor C2952 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: travel route corridor
Context triple: [Oregon Trail region, instanceOf, travel route corridor]
  • A. transportation route
    A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
  • B. transport corridor chosen
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • C. tourism route
    A tourism route is a planned sequence of destinations, attractions, and activities designed to guide travelers through a region or theme-based experience.
  • D. tourist route network
    A tourist route network is an interconnected system of paths, attractions, and services designed to guide visitors efficiently and enjoyably through a region’s key points of interest.
  • E. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e7195c48190b5580c9cfb01e95f completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:12 p.m.