Triple

T36693003
Position Surface form Disambiguated ID Type / Status
Subject IQP E906009 entity
Predicate instanceOf P0 FINISHED
Object Worcester Polytechnic Institute program C65702 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Worcester Polytechnic Institute program
Context triple: [IQP, instanceOf, Worcester Polytechnic Institute program]
  • A. Worcester Polytechnic Institute requirement
    A Worcester Polytechnic Institute requirement is a formal academic or administrative condition that students must satisfy to progress in or complete their degree programs at WPI.
  • B. Dartmouth College program
    A Dartmouth College program is an organized set of academic or co-curricular offerings, activities, and resources designed by Dartmouth to provide structured learning, development, or engagement opportunities for its students or participants.
  • C. MIT program
    An MIT program is a structured course of study or research initiative offered by the Massachusetts Institute of Technology that combines rigorous academic instruction with hands-on, innovative problem-solving experiences.
  • D. Harvard Summer School program
    The Harvard Summer School program offers open-enrollment, for-credit courses and academic experiences during the summer term, allowing high school, college, and adult learners worldwide to study with Harvard faculty on campus or online.
  • E. Yale University program
    A Yale University program is an organized course of study or initiative offered by Yale that combines specific academic, professional, or extracurricular objectives, curricula, and resources under the university’s governance.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e70d2448190bdd3ce781ba971c5 completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:12 p.m.