Triple
T36685382
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Royal Water Reservoirs in Royal Baths Park |
E905801
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ornamental water feature complex |
C17935
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ornamental water feature complex Context triple: [Royal Water Reservoirs in Royal Baths Park, instanceOf, ornamental water feature complex]
-
A.
Baroque-style water feature
A Baroque-style water feature is an ornate, theatrically designed fountain or water installation characterized by dynamic movement, elaborate sculptural decoration, and dramatic contrasts of light, shadow, and sound.
-
B.
outdoor fountain
An outdoor fountain is a decorative water feature installed in exterior spaces that circulates or sprays water for aesthetic, ambient, or architectural enhancement.
-
C.
water reservoir complex
chosen
A water reservoir complex is an integrated system of interconnected reservoirs, infrastructure, and control facilities designed to store, manage, and distribute water for purposes such as supply, irrigation, flood control, and power generation.
-
D.
man-made waterfall
A man-made waterfall is an artificial structure designed to mimic the appearance and flow of a natural waterfall, typically created for aesthetic, recreational, or environmental purposes.
-
E.
water tower complex
A water tower complex is a facility comprising one or more elevated storage tanks and associated infrastructure designed to store and distribute potable water using gravity-fed pressure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e7011dc819082b324f18b756a1b |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:12 p.m.