Triple

T36643338
Position Surface form Disambiguated ID Type / Status
Subject Code Morphing Software E904638 entity
Predicate instanceOf P0 FINISHED
Object software layer C55776 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: software layer
Context triple: [Code Morphing Software, instanceOf, software layer]
  • A. software compatibility layer
    A software compatibility layer is an intermediary system component that enables applications designed for one operating environment, platform, or API to run correctly on another without requiring modification to the original software.
  • B. software middleware chosen
    Software middleware is an intermediary layer that sits between applications and underlying systems (such as operating systems, networks, or databases) to provide common services, communication, and integration capabilities.
  • C. software
    Software is a collection of programs, data, and instructions that tell a computer or digital device how to perform specific tasks or functions.
  • D. software package
    A software package is a bundled collection of programs, libraries, configuration files, and metadata distributed together to provide specific functionality that can be easily installed, updated, and managed.
  • E. software foundation
    A software foundation is an organization that supports, governs, and promotes the development, maintenance, and open collaboration of software projects and their communities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e6d3a3c81909db73eda9e0516bd completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:11 p.m.