Triple

T36642148
Position Surface form Disambiguated ID Type / Status
Subject Project EVE E904611 entity
Predicate instanceOf P0 FINISHED
Object LF Edge project C23240 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: LF Edge project
Context triple: [Project EVE, instanceOf, LF Edge project]
  • A. EIT Manufacturing Co-Location Centre
    EIT Manufacturing Co-Location Centre is a regional hub that connects industry, academia, and innovators to collaborate on, develop, and deploy advanced manufacturing solutions within the EIT Manufacturing ecosystem.
  • B. EDL simulation framework
    A EDL simulation framework is a software environment that models and analyzes the dynamics, control, and performance of spacecraft during the Entry, Descent, and Landing phase.
  • C. Eclipse technology chosen
    Eclipse technology refers to the tools, frameworks, and platforms built on or around the Eclipse ecosystem to support software development, modeling, and application lifecycle management.
  • D. edge AI platform
    An edge AI platform is an integrated hardware and software environment that deploys, manages, and runs artificial intelligence models directly on edge devices close to data sources, enabling low-latency, secure, and efficient processing without relying heavily on centralized cloud resources.
  • E. Empa site
    An Empa site is a designated physical or virtual location where Empa conducts its research, innovation, and technology transfer activities in materials science and related fields.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e6c63e48190b1d0c3a79a6c7406 completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:11 p.m.