Triple

T36637903
Position Surface form Disambiguated ID Type / Status
Subject European Travel Information and Authorisation System E904509 entity
Predicate plannedStartOfOperations P118154 FINISHED
Object 2025 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2025 | Statement: [European Travel Information and Authorisation System, plannedStartOfOperations, 2025]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedStartOfOperations
Context triple: [European Travel Information and Authorisation System, plannedStartOfOperations, 2025]
  • A. plannedOpeningDate chosen
    Indicates the date on which something is scheduled or intended to begin operating or become available.
  • B. plannedToOperateOn
    Indicates that one entity intended or scheduled to perform an operation or procedure on another entity.
  • C. plannedOperationUntil
    Indicates that an operation is scheduled or intended to continue up to a specified end time or condition.
  • D. operatorStartDate
    Indicates the date on which an operator’s role, activity, or responsibility begins.
  • E. estimatedStartDate
    Indicates the date on which something is expected or planned to begin, based on current information or projections.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e6c63e48190b1d0c3a79a6c7406 completed May 3, 2026, 3:49 p.m.
NER Named-entity recognition batch_69fd592e48cc81909d754cc6c4bd99ae completed May 8, 2026, 3:31 a.m.
PD Predicate disambiguation batch_69fd58b7f9b881909dc099b28d567784 completed May 8, 2026, 3:30 a.m.
Created at: May 3, 2026, 4:11 p.m.