Triple
T36637431
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ENTSOG |
E904500
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | network of transmission system operators |
C64439
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: network of transmission system operators Context triple: [ENTSOG, instanceOf, network of transmission system operators]
-
A.
regional transmission organization
A regional transmission organization is an independent entity that coordinates, controls, and monitors the operation of the electric power transmission grid over a large geographic area to ensure reliable and efficient electricity delivery and competitive wholesale power markets.
-
B.
national grid system
A national grid system is a standardized framework of coordinates and infrastructure used to generate, transmit, and distribute electricity reliably across a country.
-
C.
power system
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
D.
balance of power system
A balance of power system is an international relations arrangement in which states form shifting alliances and counterweights so that no single actor becomes dominant enough to threaten the independence or security of the others.
-
E.
electricity interconnector
An electricity interconnector is a high-capacity transmission link that connects the power grids of different regions or countries, enabling cross-border exchange of electrical energy.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e6c63e48190b1d0c3a79a6c7406 |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:11 p.m.