Triple
T36622455
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Swan Hunter, Wallsend |
E904078
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | shipbuilding company facility |
C13842
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: shipbuilding company facility Context triple: [Swan Hunter, Wallsend, instanceOf, shipbuilding company facility]
-
A.
shipbuilding facility
chosen
A shipbuilding facility is an industrial site equipped with specialized infrastructure, tools, and workforce for designing, constructing, and outfitting ships and other large marine vessels.
-
B.
shipbuilding firm
A shipbuilding firm is a company that designs, constructs, and sometimes repairs ships and other marine vessels for commercial, military, or private use.
-
C.
shipbuilding holding company
A shipbuilding holding company is a parent corporation that owns and manages multiple shipbuilding and related maritime service subsidiaries, overseeing their strategic direction, finances, and operations.
-
D.
shipbuilder
A shipbuilder is a professional or company that designs, constructs, and repairs ships and other marine vessels, coordinating engineering, materials, and labor to ensure seaworthy and efficient watercraft.
-
E.
shipbuilding oversight organization
An shipbuilding oversight organization is an entity responsible for monitoring, regulating, and ensuring compliance with standards, safety, and quality in the design, construction, and maintenance of ships.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e6ae750819096911e6e2d4d12c5 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:11 p.m.