Triple

T36618589
Position Surface form Disambiguated ID Type / Status
Subject Metro Manila Skyway E903672 entity
Predicate openingDateStage3 P27116 FINISHED
Object 2021 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2021 | Statement: [Metro Manila Skyway, openingDateStage3, 2021]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: openingDateStage3
Context triple: [Metro Manila Skyway, openingDateStage3, 2021]
  • A. stageThreeStartDate chosen
    Indicates the date on which the third stage or phase of a process begins.
  • B. openingDateAsThirdSectorLine
    Indicates the date on which a railway line was opened specifically as a third-sector (joint public–private) line.
  • C. openingDatePhase2
    Indicates the date on which the second phase of a project, process, or facility is scheduled to begin or officially open.
  • D. thirdLaunchDate
    Indicates the calendar date on which an entity’s third launch or deployment occurs.
  • E. groupStageStartDate
    Indicates the date on which the group stage of an event or competition begins.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e6960e4819092047756ceb9a17e completed May 3, 2026, 3:48 p.m.
NER Named-entity recognition batch_69fd4129a8848190a5002150278ac689 completed May 8, 2026, 1:49 a.m.
PD Predicate disambiguation batch_69fd3e0515ec8190937c7af71ebc3875 completed May 8, 2026, 1:36 a.m.
Created at: May 3, 2026, 4:11 p.m.