Triple
T36609392
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Seine Axis |
E903427
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | regional development corridor |
C2218
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: regional development corridor Context triple: [Seine Axis, instanceOf, regional development corridor]
-
A.
development corridor
chosen
A development corridor is a strategically planned geographic area, often aligned along major transportation routes, where concentrated investment in infrastructure, industry, and services is used to stimulate economic growth and regional integration.
-
B.
transport corridor
A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
-
C.
transport corridor development organization
A transport corridor development organization is an entity responsible for planning, coordinating, and implementing infrastructure and policy initiatives to create, expand, and optimize multimodal transportation routes across regions or countries.
-
D.
road transportation corridor
A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
-
E.
transport corridor segment
A transport corridor segment is a defined linear portion of a transportation route (such as a road, rail line, or shipping lane) characterized by consistent physical, operational, and regulatory attributes used for planning, management, and analysis.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e6960e4819092047756ceb9a17e |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:11 p.m.