Triple

T36609298
Position Surface form Disambiguated ID Type / Status
Subject Pont d’Iéna (reconstruction works) E903424 entity
Predicate instanceOf P0 FINISHED
Object bridge reconstruction project C56669 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge reconstruction project
Context triple: [Pont d’Iéna (reconstruction works), instanceOf, bridge reconstruction project]
  • A. bridge replacement project
    A bridge replacement project is a coordinated planning, design, and construction effort to remove an existing bridge and build a new structure that meets current safety, capacity, and regulatory standards.
  • B. reconstructed bridge chosen
    A reconstructed bridge is a previously existing bridge that has been rebuilt or extensively restored, often using a combination of original and new materials, to regain or improve its structural integrity and functionality.
  • C. bridge construction program
    A bridge construction program is a coordinated set of projects, resources, and processes designed to plan, design, and build one or more bridges to meet specified functional, safety, budget, and schedule objectives.
  • D. bridge structure
    A bridge structure is an engineered construction that spans physical obstacles such as water, valleys, or roads to provide a stable pathway for transportation or movement.
  • E. proposed bridge
    A proposed bridge is a planned but not yet constructed structure designed to span a physical obstacle, documented through preliminary designs, locations, and specifications for evaluation and approval.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e6960e4819092047756ceb9a17e completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:11 p.m.