Triple

T36595337
Position Surface form Disambiguated ID Type / Status
Subject Benguela Railway E902780 entity
Predicate reopenedForFreight P59082 FINISHED
Object 2010s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2010s | Statement: [Benguela Railway, reopenedForFreight, 2010s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: reopenedForFreight
Context triple: [Benguela Railway, reopenedForFreight, 2010s]
  • A. reopenedFor chosen
    Indicates that an entity, previously closed or inactive, has been opened again to allow access, use, or operation for another entity or purpose.
  • B. reopenedAsIntermodalHub
    Indicates that a previously closed or differently used facility has been reopened and now functions as an intermodal transportation hub integrating multiple modes of transport.
  • C. continuedFreightOperationsUntil
    Indicates that an entity maintained its freight transportation activities up to and including a specified point in time.
  • D. lineClosedToFreight
    Indicates that a railway line is not available for freight services or freight train operations.
  • E. reopens
    Indicates that an entity causes something that was previously closed, stopped, or resolved to be opened, resumed, or reconsidered again.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e6592e88190bac4eb00a46e9df9 completed May 3, 2026, 3:48 p.m.
NER Named-entity recognition batch_69f7c777e924819081a6634f549fe552 completed May 3, 2026, 10:08 p.m.
PD Predicate disambiguation batch_69f7c477a4d481908f52e55b6688f60c completed May 3, 2026, 9:56 p.m.
Created at: May 3, 2026, 4:11 p.m.