Triple
T36588268
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SS Empress of Canada (2035) |
E902588
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | passenger ship project |
C61230
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: passenger ship project Context triple: [SS Empress of Canada (2035), instanceOf, passenger ship project]
-
A.
planned passenger ship
chosen
A planned passenger ship is a proposed or under-development vessel designed to transport people by sea, defined by its intended capacity, amenities, and operational routes but not yet completed or in service.
-
B.
ocean liner
An ocean liner is a large, robust passenger ship designed for regular long-distance sea voyages, typically across oceans, with an emphasis on speed, safety, and comfort rather than leisure amenities alone.
-
C.
cargo ship design
Cargo ship design is the conceptual and technical process of planning a vessel’s structure, layout, and systems to safely, efficiently, and economically transport goods across waterways.
-
D.
passenger and mail steamer
A passenger and mail steamer is a steam-powered vessel designed to transport people and postal cargo on scheduled routes across seas, rivers, or coastal waters.
-
E.
passenger ship fleet
A passenger ship fleet is a coordinated group of vessels operated under common management to transport people across waterways for travel, tourism, or commuting.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e6592e88190bac4eb00a46e9df9 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:11 p.m.