Triple
T36574212
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hubble Space Telescope operations team |
E902200
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | telescope operations team |
C22518
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: telescope operations team Context triple: [Hubble Space Telescope operations team, instanceOf, telescope operations team]
-
A.
astronomical observatory operator
chosen
An astronomical observatory operator is responsible for configuring, monitoring, and maintaining telescopes and related instruments to collect high-quality observational data of celestial objects and phenomena.
-
B.
planetary imaging team
A planetary imaging team is a group of scientists and engineers who design, operate, and analyze imaging instruments and data to study the surfaces, atmospheres, and environments of planets and other celestial bodies.
-
C.
ALMA operations organization
The ALMA operations organization is the coordinated structure of teams, processes, and resources responsible for planning, executing, maintaining, and optimizing the scientific and technical operations of the Atacama Large Millimeter/submillimeter Array.
-
D.
observatory department
An observatory department is an organizational unit within a scientific or academic institution responsible for managing observational facilities, conducting astronomical or atmospheric research, and supporting data collection and analysis activities.
-
E.
observatory director
An observatory director is the person responsible for overseeing the scientific, operational, and administrative management of an astronomical observatory, including setting research priorities, coordinating staff and resources, and ensuring effective use of observational facilities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e6416708190a9754b8c52d4e453 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:11 p.m.