Triple

T36572297
Position Surface form Disambiguated ID Type / Status
Subject Modular Equipment Transporter E902152 entity
Predicate instanceOf P0 FINISHED
Object lunar surface transport cart C26931 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: lunar surface transport cart
Context triple: [Modular Equipment Transporter, instanceOf, lunar surface transport cart]
  • A. lunar rover chosen
    A lunar rover is a mobile robotic vehicle designed to traverse, explore, and conduct scientific experiments on the surface of the Moon.
  • B. unmanned lunar lander
    An unmanned lunar lander is a robotic spacecraft designed to descend from lunar orbit and safely touch down on the Moon’s surface to conduct scientific experiments, deploy instruments, or support future missions without a human crew onboard.
  • C. asteroid lander
    An asteroid lander is a spacecraft designed to descend onto and operate on the surface of an asteroid, conducting scientific measurements, sampling, and in some cases resource prospecting.
  • D. planetary lander technology demonstrator
    A planetary lander technology demonstrator is a prototype spacecraft designed to test and validate key landing systems, instruments, and operations for future missions to planetary surfaces.
  • E. Apollo Lunar Module
    The Apollo Lunar Module was a two-stage, crewed spacecraft designed exclusively for lunar orbit operations and surface landings during NASA's Apollo missions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e6416708190a9754b8c52d4e453 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:11 p.m.