Triple
T36562681
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oregon Expressway |
E901883
|
entity |
| Predicate | hasGradeSeparations |
P31430
|
FINISHED |
| Object | yes |
—
|
LITERAL FINISHED |
Disambiguation candidates (1 decision)
The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hasGradeSeparations Context triple: [Oregon Expressway, hasGradeSeparations, yes]
-
A.
hasGradeSeparatedInterchanges
chosen
Indicates that the route or roadway includes interchanges where traffic flows are separated by different levels (e.g., overpasses/underpasses) rather than intersecting at the same grade.
-
B.
hasLaneSeparation
Indicates that there is a physical or marked separation between traffic lanes.
-
C.
hasGradeCrossings
Indicates that there are one or more level crossings where a road, path, or similar route intersects the railway or track at the same grade.
-
D.
gradeSeparationProject
Indicates a project whose purpose is to separate different transportation routes or levels (such as roads and railways) so they no longer intersect at the same grade.
-
E.
isDividedHighway
Indicates that a roadway consists of physically separated carriageways for opposing directions of traffic.
- F. None of above.
Provenance (3 batches)
| Stage | Batch ID | Job type | Status |
|---|---|---|---|
| creating | batch_69f76e634e9481908c9ba1b87ab87c26 |
elicitation | completed |
| NER | batch_69f7c9f5a8848190ba956ff27f44e396 |
ner | completed |
| PD | batch_69f7c8999a348190abc1895eaa6e036d |
pd | completed |
Created at: May 3, 2026, 4:11 p.m.