Triple

T36515205
Position Surface form Disambiguated ID Type / Status
Subject Lexington-class battlecruiser E900016 entity
Predicate instanceOf P0 FINISHED
Object planned battlecruiser class C6102 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned battlecruiser class
Context triple: [Lexington-class battlecruiser, instanceOf, planned battlecruiser class]
  • A. planned warship class chosen
    A planned warship class is a group of naval vessels of the same general design that are proposed or under development but not yet built or commissioned.
  • B. battlecruiser class
    A battlecruiser class represents a large, fast, heavily armed warship optimized for long-range offensive power at the expense of some armor protection compared to battleships.
  • C. planned ship class
    A planned ship class is a conceptual category of vessels that are formally designed and proposed, but not yet constructed or commissioned.
  • D. Indefatigable-class battlecruiser
    The Indefatigable-class battlecruiser is a class of early 20th-century British capital ships designed to combine heavy armament and high speed with relatively light armor for long-range scouting and fast wing operations in the Royal Navy.
  • E. Daring-class destroyer
    The Daring-class destroyer was a post–World War II class of large, fast, and heavily armed British Royal Navy destroyers designed for high-speed fleet escort and anti-aircraft duties.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e5dada881909da2d34bc7a9202a completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:10 p.m.