Triple
T36508601
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 1980 British and Irish Lions tour to South Africa |
E899836
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | British and Irish Lions tour |
C48455
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: British and Irish Lions tour Context triple: [1980 British and Irish Lions tour to South Africa, instanceOf, British and Irish Lions tour]
-
A.
rugby union tour
chosen
A rugby union tour is a series of matches played by a rugby team while traveling to one or more foreign regions or countries, typically over an extended period, often including both test matches and non-test fixtures.
-
B.
2015 Rugby World Cup match
A 2015 Rugby World Cup match is an individual game played between two national rugby union teams as part of the official tournament schedule of the 2015 Rugby World Cup, including its pool and knockout stages.
-
C.
national rugby union team
A national rugby union team is an officially selected group of players who represent a country in international rugby union competitions and matches.
-
D.
international rugby league tournament
An international rugby league tournament is a structured competition in which national or representative rugby league teams from different countries compete in a series of matches to determine an overall champion.
-
E.
rugby union
Rugby union is a full-contact team sport played between two sides of fifteen players each, aiming to score points by carrying, passing, kicking, and grounding an oval ball in the opponent’s in-goal area under a structured set of laws.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e5dada881909da2d34bc7a9202a |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:10 p.m.