Triple
T36500793
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Waterloo Bridge |
E899320
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Thames bridge |
C18495
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Thames bridge Context triple: [Waterloo Bridge, instanceOf, Thames bridge]
-
A.
bridge in London
chosen
A bridge in London is a structural crossing over the River Thames or other waterways in the city, designed to support vehicular, rail, or pedestrian traffic while integrating with the historic and urban landscape.
-
B.
Seine bridge
A Seine bridge is a structure that spans the River Seine, providing a crossing for pedestrians, vehicles, or trains while often serving as an architectural and cultural landmark within its urban setting.
-
C.
bridge over the River Trent
A bridge over the River Trent is a structural crossing that spans the river to connect its banks, enabling the movement of people, vehicles, or goods across the waterway.
-
D.
iron bridge
An iron bridge is a structural crossing composed primarily of iron elements, designed to span physical obstacles such as rivers or valleys while supporting loads like vehicles, pedestrians, or trains.
-
E.
bridge over the River Mersey
A bridge over the River Mersey is a structure that spans the river to provide a transportation route connecting communities on its opposite banks.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e5b92088190933afda3f7531dd4 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:10 p.m.