Triple

T36487079
Position Surface form Disambiguated ID Type / Status
Subject NVS-01 E898961 entity
Predicate instanceOf P0 FINISHED
Object navigation satellite C48002 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: navigation satellite
Context triple: [NVS-01, instanceOf, navigation satellite]
  • A. Global Navigation Satellite System
    A Global Navigation Satellite System is a satellite-based infrastructure that provides continuous, worldwide positioning, navigation, and timing services to receivers on or near Earth’s surface.
  • B. regional navigation satellite system
    A regional navigation satellite system is a space-based infrastructure that provides positioning, navigation, and timing services over a specific geographic region rather than globally.
  • C. satellite system
    A satellite system is an integrated network of orbiting spacecraft, ground stations, and communication links designed to perform functions such as communication, navigation, Earth observation, or scientific research.
  • D. satellite navigation infrastructure component chosen
    A satellite navigation infrastructure component is a physical or logical element—such as satellites, ground stations, control systems, or communication links—that collectively enables the generation, transmission, correction, and reception of positioning, navigation, and timing signals.
  • E. satellite navigation system feature
    A satellite navigation system feature is a specific capability or function within a satellite-based positioning system that enhances how location, routing, tracking, or related spatial information is calculated, presented, or used.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e5ad4588190bdbce60c52fbb785 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:10 p.m.