Triple

T36485755
Position Surface form Disambiguated ID Type / Status
Subject European Drawer Rack E898928 entity
Predicate instanceOf P0 FINISHED
Object science rack C64135 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: science rack
Context triple: [European Drawer Rack, instanceOf, science rack]
  • A. scientist's laboratory
    A scientist's laboratory is a controlled workspace equipped with specialized instruments, materials, and safety systems where scientific experiments, observations, and analyses are conducted.
  • B. lunar sample curation facility
    A lunar sample curation facility is a specialized laboratory designed to receive, preserve, document, and distribute moon rocks and regolith under strictly controlled conditions to protect their scientific integrity.
  • C. scientific building
    A scientific building is a specialized facility designed and equipped to support scientific research, experimentation, analysis, and related educational or technological activities.
  • D. science and education center
    A science and education center is a facility dedicated to promoting scientific literacy and learning through interactive exhibits, educational programs, and research-supporting resources for students and the public.
  • E. scientific base
    A scientific base is a foundational facility or infrastructure where systematic research, experimentation, and data collection are conducted to advance scientific knowledge and applications.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e5ad4588190bdbce60c52fbb785 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:10 p.m.