Triple

T36485563
Position Surface form Disambiguated ID Type / Status
Subject Columbus External Payload Facility E898924 entity
Predicate instanceOf P0 FINISHED
Object external payload facility C59494 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: external payload facility
Context triple: [Columbus External Payload Facility, instanceOf, external payload facility]
  • A. external payload platform chosen
    An external payload platform is a structural interface mounted outside a vehicle or spacecraft that supports, powers, and connects modular instruments or equipment for mission-specific operations.
  • B. communications payload
    A communications payload is the collection of onboard equipment and subsystems on a spacecraft or platform dedicated to receiving, processing, and transmitting communication signals between space and ground or between nodes in a network.
  • C. payload specialist
    A payload specialist is a mission-specific crew member, often not a career astronaut, selected for their expertise in operating, managing, or conducting experiments with particular payloads on a spaceflight.
  • D. secondary payload
    A secondary payload is an additional, typically smaller or lower-priority cargo or instrument carried alongside a primary payload on a mission or transport system, sharing available capacity and resources.
  • E. test payload
    A test payload is a controlled set of data or content sent through a system or interface to validate functionality, performance, or reliability without affecting real-world operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e5ad4588190bdbce60c52fbb785 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:10 p.m.