Triple

T36485372
Position Surface form Disambiguated ID Type / Status
Subject International Standard Payload Rack E898920 entity
Predicate instanceOf P0 FINISHED
Object modular equipment framework C64134 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: modular equipment framework
Context triple: [International Standard Payload Rack, instanceOf, modular equipment framework]
  • A. modular instrumentation platform
    A modular instrumentation platform is a flexible, scalable system that integrates interchangeable measurement and control modules into a common hardware and software framework to build customized test, monitoring, or automation solutions.
  • B. modular objects
    Modular objects are self-contained, interchangeable components designed to function independently yet integrate seamlessly within a larger system to enable flexible configuration and reuse.
  • C. modular server infrastructure
    A modular server infrastructure is a flexible, scalable system architecture composed of interchangeable, standardized components that can be independently deployed, upgraded, and maintained to meet evolving performance and capacity needs.
  • D. modular operating system
    A modular operating system is an OS architecture in which core functionality is divided into separate, interchangeable components or modules that can be independently developed, loaded, updated, or replaced to provide flexibility, maintainability, and extensibility.
  • E. modular load-carrying system
    A modular load-carrying system is a configurable assembly of interchangeable components designed to transport, support, and adapt to varying types and amounts of loads in different operational contexts.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e5ad4588190bdbce60c52fbb785 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:10 p.m.