Triple

T36454535
Position Surface form Disambiguated ID Type / Status
Subject 106th Street (planned) E898114 entity
Predicate instanceOf P0 FINISHED
Object proposed subway station C48325 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: proposed subway station
Context triple: [106th Street (planned), instanceOf, proposed subway station]
  • A. planned metro station chosen
    A planned metro station is a proposed but not yet constructed or operational transit facility intended to serve as a future stop within an urban rail or subway network.
  • B. underground metro station
    An underground metro station is a subterranean transit facility where passengers access, board, and disembark metro trains via platforms connected to the surface by tunnels, stairs, escalators, and elevators.
  • C. subway station area
    The subway station area is the spatial zone encompassing the station entrances, platforms, circulation paths, and adjacent public spaces where passengers access, wait for, and transfer between subway services.
  • D. MRT station
    An MRT station is a designated public transit facility where passengers access, board, and alight mass rapid transit trains, typically featuring platforms, ticketing systems, and connections to surrounding urban infrastructure.
  • E. public transit station
    A public transit station is a designated facility where passengers can access, board, transfer between, and disembark from public transportation services such as buses, trains, or subways.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e57f08481908593bd0bc34581c8 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:10 p.m.