Triple

T36454228
Position Surface form Disambiguated ID Type / Status
Subject OsmoNITB E898105 entity
Predicate instanceOf P0 FINISHED
Object GSM network-in-a-box implementation C62678 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: GSM network-in-a-box implementation
Context triple: [OsmoNITB, instanceOf, GSM network-in-a-box implementation]
  • A. GPRS packet control unit implementation
    A GPRS packet control unit implementation is the software and hardware logic that manages radio resource allocation, packet scheduling, and data flow control between mobile stations and the core network in a GPRS system.
  • B. 3GPP network node
    A 3GPP network node is a standardized functional entity within a 3GPP-defined mobile network (such as LTE or 5G) that performs specific control, user-plane, or management tasks to enable communication services.
  • C. IMT-2000 radio interface
    An IMT-2000 radio interface is a standardized third-generation (3G) mobile communication air interface specification that defines how user equipment and networks exchange radio signals to provide global, interoperable wireless voice and data services.
  • D. Next Generation Node B
    Next Generation Node B (gNB) is a 5G base station that provides radio access, control, and connectivity between user equipment and the 5G core network using New Radio (NR) technology.
  • E. Serving GPRS Support Node implementation
    A Serving GPRS Support Node (SGSN) implementation is a core mobile network component that manages packet-switched data sessions by handling user mobility, authentication, and routing of IP traffic between mobile devices and external data networks in a GPRS/3G architecture.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e57f08481908593bd0bc34581c8 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:10 p.m.