Triple
T36417767
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Amagi (battlecruiser hull converted to carrier, cancelled after 1923 Great Kantō earthquake) |
E897057
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned aircraft carrier |
C26691
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned aircraft carrier Context triple: [Amagi (battlecruiser hull converted to carrier, cancelled after 1923 Great Kantō earthquake), instanceOf, planned aircraft carrier]
-
A.
flying aircraft carrier
A flying aircraft carrier is a massive airborne platform that serves as a mobile base for launching, recovering, and supporting multiple aircraft while remaining aloft.
-
B.
seaplane carrier
A seaplane carrier is a naval vessel designed to transport, launch, recover, and support seaplanes for reconnaissance, patrol, and other maritime aviation operations.
-
C.
conventionally powered aircraft carrier
chosen
A conventionally powered aircraft carrier is a large naval warship that uses non-nuclear propulsion and serves as a seagoing airbase, capable of launching, recovering, and supporting fixed-wing aircraft and helicopters.
-
D.
missile carrier
A missile carrier is a vehicle or platform designed to transport, launch, and sometimes guide missiles toward designated targets.
-
E.
nuclear-powered aircraft carrier
A nuclear-powered aircraft carrier is a massive naval warship that uses nuclear reactors for propulsion and power, enabling it to launch, recover, and support aircraft operations over long durations without frequent refueling.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e54ce408190849acc3f7758937c |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:10 p.m.