Triple

T36404718
Position Surface form Disambiguated ID Type / Status
Subject Tanjung Malim branch E896719 entity
Predicate instanceOf P0 FINISHED
Object KTM Komuter line segment C19825 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: KTM Komuter line segment
Context triple: [Tanjung Malim branch, instanceOf, KTM Komuter line segment]
  • A. public transit line segment chosen
    A public transit line segment is a contiguous portion of a transit route between two consecutive stops or stations, characterized by its path, travel time, and operational attributes.
  • B. rapid transit line segment
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • C. transport corridor segment
    A transport corridor segment is a defined linear portion of a transportation route (such as a road, rail line, or shipping lane) characterized by consistent physical, operational, and regulatory attributes used for planning, management, and analysis.
  • D. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • E. trolleybus line
    A trolleybus line is a designated public transit route served by electrically powered buses that draw current from overhead wires along the roadway.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e53b81081908d3b81860593f38a completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:10 p.m.