Triple

T36393876
Position Surface form Disambiguated ID Type / Status
Subject East Park Dam E896407 entity
Predicate instanceOf P0 FINISHED
Object gravity-arch dam C3633 CONCEPT FINISHED

Disambiguation candidates (1 decision)

The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: gravity-arch dam
Context triple: [East Park Dam, instanceOf, gravity-arch dam]
  • A. arch-gravity dam chosen
    An arch-gravity dam is a concrete dam that combines the curved, arch action of an arch dam with the mass and weight-based stability of a gravity dam to resist water pressure.
  • B. arch dam
    An arch dam is a curved concrete dam that transfers the water pressure primarily into the abutments through arch action, allowing a thinner structure than gravity dams.
  • C. masonry gravity dam
    A masonry gravity dam is a massive structure built from stone or brick masonry whose own weight resists the horizontal pressure of the water it retains.
  • D. arch-and-buttress dam
    An arch-and-buttress dam is a concrete dam that combines a curved arch structure, which transfers water pressure laterally to the abutments, with a series of buttresses that support the upstream face and reduce the volume of material required.
  • E. concrete gravity dam
    A concrete gravity dam is a massive structure made of concrete that resists the horizontal thrust of water primarily through its own weight and the force of gravity.
  • F. None of above.

Provenance (1 batch)

Stage Batch ID Job type Status
creating batch_69f76e52e3108190becf70b090ae7bd6 elicitation completed
Created at: May 3, 2026, 4:10 p.m.