Triple

T36379132
Position Surface form Disambiguated ID Type / Status
Subject IERS data and product centres E895993 entity
Predicate instanceOf P0 FINISHED
Object geodetic data centre C61120 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: geodetic data centre
Context triple: [IERS data and product centres, instanceOf, geodetic data centre]
  • A. geodetic organization chosen
    A geodetic organization is an entity responsible for measuring, monitoring, and managing the Earth's geometric shape, gravity field, and spatial reference systems to support mapping, navigation, and geospatial analysis.
  • B. geodetic datum
    A geodetic datum is a reference framework consisting of a defined origin, orientation, and scale used to precisely locate points on the Earth’s surface in terms of latitude, longitude, and elevation.
  • C. geodetic reference point
    A geodetic reference point is a precisely surveyed physical location on the Earth's surface used as a fixed coordinate reference for mapping, surveying, and geospatial measurements.
  • D. geodetic datum component
    A geodetic datum component is an individual element (such as an ellipsoid, reference frame, or coordinate system parameter) that contributes to defining the position, orientation, and scale of a geodetic datum used for spatial referencing on or near the Earth’s surface.
  • E. geodetic observing system
    A geodetic observing system is an integrated network of instruments, platforms, and data-processing facilities designed to measure and monitor the Earth's shape, gravity field, rotation, and surface deformation with high precision.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e51d358819092bbc5f119f49476 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:10 p.m.