Triple

T36377770
Position Surface form Disambiguated ID Type / Status
Subject Cheboygan Dam E895951 entity
Predicate instanceOf P0 FINISHED
Object navigation control structure C48004 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: navigation control structure
Context triple: [Cheboygan Dam, instanceOf, navigation control structure]
  • A. navigation system
    A navigation system is a coordinated set of hardware and software components that determines a user's position and provides optimal routes and guidance to reach desired destinations.
  • B. navigation program
    A navigation program is software that calculates and displays optimal routes, real-time directions, and location-based information to guide users from one place to another.
  • C. navigation reference point
    A navigation reference point is a fixed, identifiable location or marker used to determine position, guide movement, and support orientation within a physical or virtual space.
  • D. Navigation infrastructure chosen
    Navigation infrastructure encompasses the physical and digital systems, structures, and services that enable the accurate, efficient, and safe movement of people, vehicles, and information through space.
  • E. navigator
    A navigator is an entity responsible for determining and directing the optimal path or course from a starting point to a desired destination using available information and tools.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e51d358819092bbc5f119f49476 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:10 p.m.