Triple

T36367905
Position Surface form Disambiguated ID Type / Status
Subject MAP (Multidisciplinary Action Projects) E895675 entity
Predicate instanceOf P0 FINISHED
Object consulting project course C66308 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: consulting project course
Context triple: [MAP (Multidisciplinary Action Projects), instanceOf, consulting project course]
  • A. architectural consulting project
    An architectural consulting project is a professional engagement in which architects analyze client needs, evaluate existing conditions, and develop strategic design recommendations, plans, and guidance to inform and optimize building or spatial development decisions.
  • B. public survey project
    A public survey project is an organized effort to collect, analyze, and report data on opinions, behaviors, or characteristics from a defined population using systematically designed questionnaires or interviews.
  • C. public works project
    A public works project is a government-funded initiative to plan, construct, or maintain infrastructure and facilities that serve the general public’s needs and welfare.
  • D. project-based curriculum chosen
    A project-based curriculum is an educational approach in which students learn key concepts and skills by actively engaging in extended, real-world projects that require inquiry, collaboration, and problem-solving.
  • E. studio project
    A studio project is a creative, often collaborative, hands-on assignment in a studio-based course where students design, develop, and present work that applies theoretical concepts to practical, real-world or experimental problems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e5115588190ad8738860b7bc68b completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:10 p.m.